Send Message

China Work Platforms Online Market

High quality, Best service,Reasonable price.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsSuspended Working Platform

Auto climb formwork , bridge deck formwork for Melak Bridge project

I'm Online Chat Now
Certification
China China Work Platforms Online Market certification
China China Work Platforms Online Market certification
You always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation

—— Tim

Does your sourcing platform have a good reputation, the delivery time was very punctual, there was no case of poor stock, and we did not find cargo da

—— Mr. Carlos

Easy to talk with, very professional and fast service, the flag quality is super good. Even better than we ordered from Germany!!

—— Germany Fabian Scherb

Auto climb formwork , bridge deck formwork for Melak Bridge project

Auto climb formwork , bridge deck formwork for Melak Bridge project
Auto climb formwork , bridge deck formwork for Melak Bridge project Auto climb formwork , bridge deck formwork for Melak Bridge project Auto climb formwork , bridge deck formwork for Melak Bridge project Auto climb formwork , bridge deck formwork for Melak Bridge project

Large Image :  Auto climb formwork , bridge deck formwork for Melak Bridge project Get Best Price

Product Details:
Place of Origin: Beijing, China (Mainland)
Brand Name: ZULIN
Certification: ISO9001-2008
Model Number: Auto-climbing Formwork; Ring-lock Shoring; Box Girder Formwork
Payment & Shipping Terms:
Minimum Order Quantity: One 20ft container
Price: negotiate
Packaging Details: in bulk ,pallet ,bundle or according the customer demand
Delivery Time: after deposit 15-20 days
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 100sets/day
Detailed Product Description
High Light:

bridge deck formwork

,

pier cap formwork

Steady, synchronous and safe Auto Self Climbing Formwork QPMX-50

 

Descrition: 

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder 

and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, 

so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is

fast and safe.

 

Structure 


Steady, synchronous and safe Auto Self Climbing Formwork QPMX-50

 

The Characteristics 


1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination 

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is

 reduced while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are 

greatly reduced.

 

 

Standard Climbing Process 


1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete

 pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and

 formwork to the right position, match the formwork and do the second pouring.
3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4. Match the formwork to the right position and do the third pouring.
5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
 

Auto climb formwork , bridge deck formwork for Melak Bridge project 1Auto climb formwork , bridge deck formwork for Melak Bridge project 2Auto climb formwork , bridge deck formwork for Melak Bridge project 3Auto climb formwork , bridge deck formwork for Melak Bridge project 4

Project:

Melak Bridge project.(Indonesia, kalimantan)

Client:

PT . WASKITA KARYA 

Date:

01/2014

Formwork  Type:

Hydraulic Automatic Climbing Formwork

Comments of client:

We chose Zulin, because it offered the best solution for our project. All demands and our requirements were taken into consideration right down to the smallest detail. We like working with Zulin systems as they are intelligently design, offer a high degree of safety and provide fast cycle times.

Contact Details
China Work Platforms Online Market

Contact Person: tt

Send your inquiry directly to us